Al-Khamsin Pump Station
Al-Khamsin Pump Station
Owner
The Holding Company of Water and Wastewater (HCWW)
Contractor
Al Obour Contracting and General Supplies
Capacity
35 L/s
Service Level
Full Pack
Service Level
Ismailia, Egypt
Service Level
HCWW
Overview
Al-Khamsin Pump Station was developed to strengthen wastewater conveyance capacity in Ismailia and improve system reliability under HCWW. WATER Consultations delivered a full-pack scope including design, tendering, supervision, and QA. The works covered hydraulic modeling and surge analysis, pump and electromechanical design, reinforced concrete and steel structures, civil site networks and roads, and architectural elements such as control buildings and fencing. The station integrates efficiency, resilience, and compliance with HCWW standards, ensuring reliable service and future-ready operation.
Technical Scope and Deliverables
- Hydraulic design and flow calculations for influent, wet well, pumps, and rising main.
- Surge analysis and transient protection for rising main.
- Hydraulic gradient line (HGL) for suction/discharge systems.
- Design of internal plant networks and civil tie-ins.
- Hydraulic calculation notes and surge analysis report.
- Process flow diagrams (PFDs) and HGL drawings.
- Layouts for wet well, inlet/outlet, and piping.
- BOQ for hydraulic works.
- Design of submersible pumps, wash-water pumps, and auxiliaries.
- Manifold and valve chamber layouts.
- Ventilation systems for wet well and MCC.
- Firefighting provisions.
- Mechanical calculation notes.
- Equipment datasheets and vendor lists.
- Mechanical layouts and shop drawings.
- HVAC and firefighting drawings.
- Specifications and BOQ.
- Load list and sizing of MV/LV switchgear, MCCs, VFDs, UPS.
- SCADA and instrumentation.
- Internal/external lighting and emergency lighting.
- Fire alarm, telecom, earthing, and lightning protection.
- Load list and SLDs.
- Generator/transformer sizing notes.
- Short-circuit and voltage drop calculations.
- SCADA I/O lists, tag points, and control philosophy.
- Lighting, earthing, and telecom drawings.
- Specifications, BOQ, vendor list.
- RC design for wet well, valve chambers, and foundations.
- Steel works for racks, covers, and access structures.
- Geotechnical integration and dewatering.
- Structural design criteria and calculations.
- Reinforcement drawings (RC and steel).
- Structural details for tanks and service buildings.
- BOQ for structural works.
- Architectural design for control/MCC building and ancillary facilities.
- Fencing, gates, guard room, and landscaping.
- Internal and external finishing works.
- Layouts, elevations, and sections.
- Finishing schedules and insulation details.
- Drawings for fences, gates, and guard house.
- BOQ and specifications.
- Site grading and excavation/backfilling.
- Roads, paving, and walkways.
- Storm drainage and utilities coordination.
- Civil drawings for grading, roads, and utilities.
- Earthworks calculation sheets.
- Stormwater drainage layouts.
- BOQ for civil and site works.
Related insights
Explore other pump station and infrastructure works we have delivered across Egypt and the region.
Designing Wastewater Treatment Plants for Reliability, Compliance and Lower Costs
Wastewater Treatment Plant Design: From Process Selection to a Reliable, Buildable and Cost-Effectiv...
Industrial Wastewater Treatment Design & Solutions | WATER
Industrial Wastewater Treatment: How the Right Engineering Design Protects Compliance, Production an...
معالجة مياه صرف مصانع الأغذية: دليل متكامل لتصميم محطة معالجة فعالة
تُعد معالجة مياه صرف مصانع الأغذية من أهم التحديات الهندسية والبيئية التي تواجه مصانع الأغذية والمشر...
تصميم محطات تحلية مياه البحر: الدليل الهندسي الشامل
أصبحت محطات تحلية مياه البحر أحد أهم الحلول المستخدمة لتوفير مصادر مياه مستقرة في الدول التي تعاني ...
Looking for a reliable engineering partner? WATER delivers full-cycle consultancy.
Discuss Your Project
Share requirements and timelines. We’ll reply with a proposed scope, duration, and deliverables bundle.
- 48–72h response with scope draft
- Optional sample PFD page on request
- Alignment with SWCC / NWC / HCWW formats
By submitting, you agree to be contacted about your inquiry.