WATER – Engineering Consultation

Al-Hajrasi Pump station

Al-Hajrasi Pump station

Contractor

Al Obour Contracting and General Supplies

Operator

The Holding Company of Water and Wastewater (CCWW)

Capacity

150 litres/second

Location

Ismailia – Egypt

Project Overview

Al-Hajrasi Pump Station project, designed to serve the villages of Rashid Sulaiman, Al-Hajrasi, Al-Jarir – Abdel Nabi, and Teraa 5 in Abu Swier – Ismailia governorate, is structured into two phases to ensure sustainable wastewater management. The first phase, operational until 2037, handles a discharge capacity of 90 liters per second, while the second phase, from 2037 to 2057, increases capacity to 150 liters per second. The station receives wastewater from the sewage networks of Al-Hajrasi and a forcemain line from Rashid Sulaiman Pump Station, with a 250 mm diameter and a length of 5320 meters. The discharge line has a diameter of 500 mm and extends 5250 meters, serving approximately 26949 residents.

Get In Touch

Have Any Upcoming Project ?

Project Services

Water Engineering Consultations is a leading provider of comprehensive engineering solutions, specializing in water-related projects. With a dedicated team of experts and a commitment to excellence, we deliver sustainable, innovative, and client-focused services. From concept to completion, we strive to exceed expectations and make a positive impact on the world through our engineering expertise