WATER – Engineering Consultation

Al-Foly Pump Station

Al-Foly Pump Station

Contractor

Al Obour Contracting and General Supplies

Operator

The Holding Company of Water and Wastewater (CCWW)

Capacity

80 litres/second

Location

Ismailia – Egypt pt

Project Overview

Al Fouly Pump Station project, designed to serve the villages of Al-Karaim and Al Fouly in Abu Swier – Ismailia governorate, is structured into two phases to ensure sustainable wastewater management. The first phase, operational until 2037, handles a discharge capacity of 50 liters per second, while the second phase, from 2037 to 2057, increases capacity to 80 liters per second. The station receives wastewater from the sewage networks of Al Fouly and a forcemain line from Al-Karaim Pump Station, with a 200 mm diameter and a length of 2620 meters. The discharge line has a diameter of 355 mm and extends 3850 meters, serving approximately 13506 residents.

Get In Touch

Have Any Upcoming Project ?

Project Services

Water Engineering Consultations is a leading provider of comprehensive engineering solutions, specializing in water-related projects. With a dedicated team of experts and a commitment to excellence, we deliver sustainable, innovative, and client-focused services. From concept to completion, we strive to exceed expectations and make a positive impact on the world through our engineering expertise