
Al-Ahrar Wastewater Treatment Plant
Abu Swier Northen Wastewater Treatment Plant (WWTP)
Owner
Holding Co. for Water & Wastewater (HCWW)
Contractor
Al Obour Contracting
Capacity
35 L/s
Service Level
Combination
Overview
Abu Swier Northen Wastewater Treatment Plant (WWTP) showcases our engineering consultancy services covering Tender, Detailed Design, and Shop Drawings for a design capacity of 8,000 m3/day. It ensures reliable performance, full compliance with the Holding Company of Water and Wastewater (HCWW), and alignment with international standards.
Technical Scope and Deliverables
The tabs below are generated dynamically from TECH_CONTENT. Send me new content and I will plug it in without touching the UI.
- Initial Process Flow Diagram illustrating major process streams and equipment.
- Process description document outlining key steps and rationale.
- List of major equipment with preliminary specifications.
- Initial Process Flow Diagram illustrating major process streams and equipment.
- Process description document outlining key steps and rationale.
- List of major equipment with preliminary specifications.
- Initial Process Flow Diagram illustrating major process streams and equipment.
- Process description document outlining key steps and rationale.
- List of major equipment with preliminary specifications.
- Initial Process Flow Diagram illustrating major process streams and equipment.
- Process description document outlining key steps and rationale.
- List of major equipment with preliminary specifications.
- Initial Process Flow Diagram illustrating major process streams and equipment.
- Process description document outlining key steps and rationale.
- List of major equipment with preliminary specifications.
- Initial Process Flow Diagram illustrating major process streams and equipment.
- Process description document outlining key steps and rationale.
- List of major equipment with preliminary specifications.
- Initial Process Flow Diagram illustrating major process streams and equipment.
- Process description document outlining key steps and rationale.
- List of major equipment with preliminary specifications.
- Initial Process Flow Diagram illustrating major process streams and equipment.
- Process description document outlining key steps and rationale.
- List of major equipment with preliminary specifications.
- Initial Process Flow Diagram illustrating major process streams and equipment.
- Process description document outlining key steps and rationale.
- List of major equipment with preliminary specifications.
- Initial Process Flow Diagram illustrating major process streams and equipment.
- Process description document outlining key steps and rationale.
- List of major equipment with preliminary specifications.
- Initial Process Flow Diagram illustrating major process streams and equipment.
- Process description document outlining key steps and rationale.
- List of major equipment with preliminary specifications.
- Initial Process Flow Diagram illustrating major process streams and equipment.
- Process description document outlining key steps and rationale.
- List of major equipment with preliminary specifications.
Related Projects
Explore other pump station and infrastructure works we have delivered across Egypt and the region.
Sewerage Networks In West Safwa, Al-Fayha Neighborhood In Sihat, The South Al-Majidiyah Plan Area
Pumping Station, Force Main, Sewer Collection Network In King Fahd Area in Jubail
Related Projects
Explore other pump station and infrastructure works we have delivered across Egypt and the region.
RO Plant Design for Hotel: Capacity, Process, Cost and Water Supply Requirements
.water-ro-hotel,.water-ro-hotel * { box-sizing: border-box;}
.water-ro-hotel { direc...
استشاري مرافق لمشروع عقاري: تصميم شبكات المياه والصرف ومحطات المعالجة
.water-realestate-blog,.water-realestate-blog * { box-sizing: border-box;}
.water-reale...
Compact Wastewater Treatment Plant: Design, Applications, MBBR Technology and Cost Factors
.water-compact-blog,
.water-compact-blog * {
box-sizing: border-box;
}
.water-compa...
تكلفة محطة معالجة صرف لمصنع صغير: ما الذي يحدد السعر وكيف تتجنب اختيار محطة غير مناسبة؟
عند التخطيط لإنشاء مصنع صغير أو توسيع خط إنتاج قائم، تظهر معالجة مياه الصرف عادةً كأحد البنود التي ي...
Looking for a reliable engineering partner? WATER delivers full-cycle consultancy.
Discuss Your Project
Share requirements and timelines. We’ll reply with a proposed scope, duration, and deliverables bundle.
- 48–72h response with scope draft
- Optional sample PFD page on request
- Alignment with SWCC / NWC / HCWW formats
By submitting, you agree to be contacted about your inquiry.



